Request page · Records & permits
Unstick an Austin permit review or answer corrections
ATX reads the official review record with you, names the owner of each correction, and files the response or status question.
Short answer
A stalled permit usually sits on a specific comment, not a mystery. The review record lists each correction and the reviewer who owns it; answering in the record, with the right documents, is what moves it. We read it with you and file the response.
Who this is for
Austin applicants whose building, trade, or site-plan review is sitting in corrections or has gone quiet past the stated review time.
The steps, in order
- Pull the permit or site-plan number and open the review record.
- List each outstanding comment and which reviewer owns it.
- Gather the document or change each comment asks for.
- ATX files the correction response or the status question.
- Set the next status check from the record's stated review window.
Have this ready
- The permit or case number
- The review comments if you have them
- Who filed the application
Common mistakes to avoid
- Guessing at a requirement instead of answering the written comment; the record is the checklist.
- Emailing a reviewer outside the record; responses outside the system do not clear the comment.
Common questions
How long does Austin residential plan review take?
Review windows are stated per review type and reset when corrections come in. If the window passed with no movement, a status question through the official record is the right nudge.
Who can respond to permit corrections in Austin?
The applicant of record or their authorized agent responds. If a contractor filed, they usually own the response; the record shows who.
Official sources
Checked August 26, 2026. Recheck the official page monthly and when the official page changes.
Open this request in the catalog
Related
ATX Untangled is independent and does not determine eligibility or provide legal advice.